Hatteras 59 Change Order- Profile
2021 Hatteras GT59 Convertible-Change Order
This 2021 HATTERAS 59’ GT59 CONVERTIBLE “Change Order” is a 3 stateroom 2 head layout with 600hrs on reliable CAT C32A engines. The engines are still under warranty and warranty can be extended out further. All service is up to date on engines and generators with records. The 2021 59’ HATTERAS CONVERTIBLE is loaded with options and is in very nice condition. Call to inquire for more information or schedule a showing on "Change Order" the 2021 HATTERAS 59’ CONVERTIBLE GT59.
HIGHLIGHTS
Stock #: MM
LOA: 59' (17.98 Meters)
Type: Power- Used
Year: 2021
Beam: 18' 9''
Draft Max: 4' 9''
Cabins: 3
Heads: 2
Fuel Type: Diesel
Hull Material: Fiberglass
Fuel Tank: 1750 Gallons (6624.47 Liters)
Fresh Water: 200 Gallons (757.08 Liters)
Holding Tank: 120 Gallons (454.25 Liters)
Displacement: 89000 lbs
Hatteras 59 Change Order- Profile
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Profile
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Profile
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Profile
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Profile
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Profile
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Transom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Transom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Cockpit
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Flybridge
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Dinette
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Dinette
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Salon
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Galley
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Galley
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Galley
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Galley
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Master Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Master Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Master Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Master Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Master Stateroom
2021 Hatteras GT59 Convertible-Chang2021 Hatteras GT59 Convertible-Change Order Order
Hatteras 59 Change Order- Master Stateroom
2021 Hatteras GT59 Convertible-Chang2021 Hatteras GT59 Convertible-Change Order Order
Hatteras 59 Change Order- Master Stateroom Head
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Master Stateroom Head
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Master Stateroom Head
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Master Stateroom Head
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- VIP Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- VIP Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- VIP Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- VIP Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- VIP Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- VIP Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- VIP Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- VIP Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Guest Head
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Guest Head
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Guest Head
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Guest Head
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Guest Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Guest Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Guest Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Guest Stateroom
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Hatteras 59 Change Order- Engine Room
2021 Hatteras GT59 Convertible-Change Order
Salon:
Galley/Dinette:
Companionway:
Master Stateroom
Master stateroom head
VIP Stateroom:
VIP/Day head
Starboard Bunk Stateroom
Tackle room
Flybridge
Electronics:
Cockpit:
Engine Room:
Foredeck
Engine and generator hours are as of the date of the original listing and are a representation of what the listing broker is told by the owner and/or actual reading of the engine hour meters. The broker cannot guarantee the true hours. It is the responsibility of the purchaser and/or his agent to verify engine hours, warranties implied or otherwise and major overhauls as well as all other representations noted on the listing brochure.
The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.
Listing MLS by Yachtr.com
Direct: 1-586-940-4341
Email: dave@southrivermarine.com
What makes us stand out is that we provide with all services throughout the process of buying, selling and owning a boat. We Finance, we provide Insurance, Storage and much more. Contact us to learn about the overall experience we provide to our customers.